Newsletter
Our Vision
P.M.T. Haag is continuously focused on Site/Manufacturing capability development and process improvement in order to reach the best quality in logistic, product manufacturing flow and service provision.
Subject of firm actions, PMT proposed the following investments:
- traveling bridge with crane
- abkant
- rolling machine
- laser cutting
- modernization of the car fleet and the work infrastructure on the construction site
New Projects
Thanks to the trust that our partners grant us, we have the opportunity to highlight our technical and engineering skills thereby contributing to increase the construction project performance by integrating the production and erection processes, using a high skilled management implementing its techniques. The results shall provide valuable insight into the possibility of smooth running and improving of construction processes to our new awarded projects which we are very proud to announce.
Odor treatment plant at Petrobrazi (OMV Petrom), Ploiesti, Romania
The Project is part of the actions and activities being carried to fulfill the requirements of the Integrated Environmental Authorization, with respect to the threshold value for odor emissions over the Refinery perimeter, an odor limitation plan by applying the best available techniques (BAT) has to be implemented.
PMT Haag was awarded as subcontractor for Mechanical Erection Works, including Pipe works, Ducts, Covers and Specific Equipment Assembly works for the full plant.


Voltalia Sinnamary Biomasse Energie (SBE), French Guyana
The Project consist in design, supply and startup of a 10.5 MW biomass power generating facility, to be built at the Client’s facility located in Sinnamary, French Guyana. Applied technology is a water tube boiler with vibrating grate as combustion system and one drum.
System capacity: 45tph, 79barg, 525°C
Electric power: 10.5Mwel
Thermal power: 40Mwth
Fuel: Wood chips
PMT Haag was awarded as subcontractor for Mechanical Erection Works, including Steel and Pipe works, Ducts, Tanks and Specific Equipment Assembly works for the full plant.